toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Electrical - MIL ON/DTC P0705 Set After Trailer Towing|Page 7624 > < Electrical - MIL ON/DTC P0705 Set After Trailer Towing|Page 7622
Page 8
background image

10.

Locate the green wire coming from pin 3 of connector JK2 and install the wire tap from the NEW sub-wire harness.

HINT

With the sub-wire harness lying on the floor, route the green wire inside of the dash in front of the instrument panel support tube.

11.

Wrap the sub-wire harness connection with foam tape.

Electrical - MIL ON/DTC P0705 Set After Trailer Towing|Page 7624 > < Electrical - MIL ON/DTC P0705 Set After Trailer Towing|Page 7622