Venza AWD L4-2.7L (1AR-FE) (2009)
2. INSTALL WIRE HARNESS CLAMP BRACKET
(a) Install the clamp bracket with the bolt.
Torque: 10 Nm (102 kgf-cm, 7ft-lbf)
(b) Attach the wire harness clamp to the clamp bracket.
3. INSTALL V-RIBBED BELT
HINT: See: Engine, Cooling and Exhaust/Engine/Drive Belts, Mounts, Brackets and Accessories/Drive Belt/Service and Repair/Installation
4. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and
Replacement/Engine Assembly/Installation
5. INSTALL COOL AIR INTAKE DUCT SEAL See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Installation
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected See: Testing and
Inspection/Repair Instruction - Initialization.
Replacement
1AR-FE BATTERY / CHARGING: GENERATOR: REPLACEMENT
REPLACEMENT
1. REPLACE GENERATOR DRIVE END FRAME BEARING
(a) Remove the 4 screws and bearing retainer.
(b) Using SST and a hammer, tap out the bearing.
SST: 09950-60010
09951-00250
SST: 09950-70010
09951-07100