Venza AWD V6-3.5L (2GR-FE) (2010)
5. INSTALL NO. 3 INSTRUMENT PANEL REINFORCEMENT
(a) Install the No. 3 instrument panel reinforcement with the 2 nuts.
(b) Connect the earth wire with the bolt.
Torque : 8.4 Nm (86 kgf-cm, 74 in-lbf)
(c) Engage the clamp.
Text in Illustration
6. INSTALL NO. 6 HEATER TO REGISTER DUCT ASSEMBLY
(a) Engage the 4 claws to install the No. 6 heater to register duct assembly.
(b) Engage the clamp.
7. INSTALL NO. 1 CONSOLE BOX DUCT
(a) Install the No. 1 console box duct with the clip as shown in the illustration.