Venza FWD L4-2.7L (1AR-FE) (2009)
(c) Install the hood lock assembly with the 3 bolts.
[A] Centering Bolt - Torque: 8.0 Nm (82 kgf-cm, 71in-lbf)
[A] Standard Bolt - Torque: 7.5 Nm (77 kgf-cm, 66in-lbf)
[B] - Torque: 8.0 Nm (82 kgf-cm, 71in-lbf)
(d) Connect the connector.
(e) Install a new hood lock nut cap.
7. INSTALL HIGH PITCHED HORN ASSEMBLY See: Lighting and Horns/Horn/Service and Repair/High Pitched Horn/Installation
8. INSTALL RADIATOR GRILLE See: Grille/Service and Repair/Installation
9. INSTALL RADIATOR GRILLE PROTECTOR See: Grille/Service and Repair/Installation
10. INSTALL COOL AIR INTAKE DUCT SEAL See: Bumper/Front Bumper/Service and Repair/Installation
11. INSTALL FRONT FENDER LINER LH
(a) Install the front fender liner with 3 new grommets and the 8 screws.
(b) Install the bolt and 4 clips.
(c) Install the pin hold clip.