Venza FWD L4-2.7L (1AR-FE) (2009)
(a) Install the vacuum switching valve (for ACIS) with the bolt.
Torque: 9.0 Nm (92 kgf-cm, 80in-lbf)
(b) Connect the 2 vacuum hoses, 2 union to connector tube hoses, clamp and connector.
9. INSTALL THROTTLE BODY ASSEMBLY
(a) Install the throttle body assembly See: Powertrain Management/Fuel Delivery and Air Induction/Throttle Body/Service and Repair/Installation.
10. CONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
CAUTION: When disconnecting the cable, some systems need to be initialized after the cable is reconnected See: Testing and
Inspection/Repair Instruction - Initialization.
11. INSPECT FOR FUEL LEAK
HINT: See: Powertrain Management/Fuel Delivery and Air Induction/Service Precautions/Fuel System.