Venza FWD L4-2.7L (1AR-FE) (2009)
Text in Illustration
6. ECM (for 1AR-FE Engine)
(a) Disconnect the connectors of the ECM.
Text in Illustration
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
for CAN No. 1 Bus Main Wire
for Power Management Bus Main Wire