Venza FWD L4-2.7L (1AR-FE) (2009)
(e) Using SST, measure the clearance of the front axle inboard joint boot clamp.
SST: 09240-00020
Clearance:
0.5 to 1.5 mm (0.0197 to 0.0591 in.)
NOTICE: If the measured value is greater than the specified value, retighten the clamp.
13. INSTALL NO. 2 FRONT AXLE INBOARD JOINT BOOT CLAMP (for 1AR-FE)
(a) Using needle-nose pliers, engage the 2 claws to install the No. 2 front axle inboard joint boot clamp as shown in the illustration.
14. INSTALL NO. 2 FRONT AXLE INBOARD JOINT BOOT CLAMP (for 2GR-FE)
(a) Hold the front drive inboard joint shaft assembly in a vise between aluminium plates.
NOTICE: Do not overtighten the vise.
(b) Secure the No. 2 front axle inboard joint boot clamp onto the front axle inboard joint boot.
(c) Place SST onto the No. 2 front axle inboard joint boot clamp.
SST: 09521-24010
(d) Tighten SST so that the No. 2 front axle inboard joint boot clamp is pinched.
NOTICE: Do not overtighten SST.
(e) Using SST, measure the clearance of the No. 2 front axle inboard joint boot clamp.
SST: 09240-00020
Clearance:
0.5 to 1.5 mm (0.0197 to 0.0591 in.)
NOTICE: If the measured value is greater than the specified value, retighten the clamp.
15. INSTALL FRONT DRIVE SHAFT HOLE SNAP RING