Venza FWD V6-3.5L (2GR-FE) (2010)
Thermostat: Service and Repair
Installation
2GR-FE COOLING: THERMOSTAT: INSTALLATION
1. INSTALL THERMOSTAT
(a) Install a new gasket to the thermostat.
(b) Install the thermostat with the jiggle valve facing up.
HINT
The jiggle valve may be set within 10° on either side of the prescribed position.
2. INSTALL WATER INLET
(a) Install the water inlet with the 2 nuts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
3. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY See: Engine/Service and Repair/Removal and Replacement/Engine Unit/Installation
4. CONNECT NO. 2 RADIATOR HOSE
(a) Connect the No. 2 radiator hose to the water inlet.
5. INSTALL V-RIBBED BELT See: Engine/Drive Belts, Mounts, Brackets and Accessories/Drive Belt/Service and Repair/Installation
6. ADD ENGINE COOLANT See: Coolant/Service and Repair
7. INSPECT FOR COOLANT LEAK See: Testing and Inspection
8. INSTALL V-BANK COVER SUB-ASSEMBLY See: Engine/Service and Repair/Removal and Replacement/Engine Assembly/Installation
9. INSTALL FRONT FENDER APRON RH