Venza FWD V6-3.5L (2GR-FE) (2010)
Evaporative Emission Control Canister: Service and Repair
Installation
2GR-FE EMISSION CONTROL: CANISTER: INSTALLATION
1. INSTALL CHARCOAL CANISTER ASSEMBLY
(a) Install the charcoal canister assembly with the 4 nuts and 2 clips.
Torque : 5.5 Nm (56 kgf-cm, 49 in-lbf)
(b) Connect the 2 quick connectors, hose and connector.
2. INSTALL NO. 1 FLOOR UNDER COVER
(a) Install the No. 1 floor under cover with the 5 clips.
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected See: Testing and
Inspection/Programming and Relearning/Repair Instruction - Initialization.