Venza FWD V6-3.5L (2GR-FE) (2010)
Positive Crankcase Ventilation Valve: Service and Repair
Installation
2GR-FE EMISSION CONTROL: PCV VALVE: INSTALLATION
1. INSTALL VENTILATION VALVE SUB-ASSEMBLY
(a) Apply adhesive to 2 or 3 threads of the ventilation valve sub-assembly.
Text in Illustration
Adhesive:
Toyota genuine adhesive 1324, three bond 1324 or equivalent
(b) Using a 19 mm deep socket wrench, install the ventilation valve sub-assembly.
Torque : 27 Nm (275 kgf-cm, 20 ft-lbf)
(c) Connect the ventilation hose to the ventilation valve sub-assembly.
2. INSTALL V-BANK COVER SUB-ASSEMBLY See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and
Replacement/Engine Assembly/Installation