toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Fuel Delivery and Air Induction > < Components|Page 3643
Page 1
background image

Positive Crankcase Ventilation Valve: Service and Repair
Installation

2GR-FE EMISSION CONTROL: PCV VALVE: INSTALLATION

1. INSTALL VENTILATION VALVE SUB-ASSEMBLY

(a) Apply adhesive to 2 or 3 threads of the ventilation valve sub-assembly.

Text in Illustration

Adhesive:

Toyota genuine adhesive 1324, three bond 1324 or equivalent

(b) Using a 19 mm deep socket wrench, install the ventilation valve sub-assembly.

Torque : 27 Nm (275 kgf-cm, 20 ft-lbf)

(c) Connect the ventilation hose to the ventilation valve sub-assembly.

2. INSTALL V-BANK COVER SUB-ASSEMBLY   See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and

Replacement/Engine Assembly/Installation

Fuel Delivery and Air Induction > < Components|Page 3643