Venza FWD V6-3.5L (2GR-FE) (2010)
Shift Cable: Service and Repair
Installation
U660E AUTOMATIC TRANSMISSION / TRANSAXLE: TRANSMISSION CONTROL CABLE: INSTALLATION
1. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY
NOTICE:
Before installing the transmission control cable assembly, check that the park/neutral position switch and the shift lever are in
neutral.
(a) Pass the control cable from the cabin to the engine compartment.
(b) Install the No. 2 shift cable grommet retainer with the 2 bolts.
Text in Illustration
Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)
(c) Connect the transmission control cable to the No. 2 transmission control cable bracket.
(d) Before attaching cable to transmission, make sure to pull cable through dash grommet into engine compartment side until cable crimp is fully
seated against dash grommet.
(e) Connect the transmission control cable to the control shaft lever with the nut.
Torque : 13 Nm (130 kgf-cm, 9 ft-lbf)
(f) Connect the transmission control cable to the transmission control cable bracket with a new clip.
2. INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR