Yaris L4-1.5L (1NZ-FE) (2007)
2. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY
(a)
Install the transmission control cable onto the control shaft lever with the nut.
Torque: 12 N*m (122 kgf*cm, 9 ft.*lbf)
(b) Install the transmission control cable into the bracket with the new clip.
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
4. ADJUST SHIFT LEVER POSITION
5. INSPECT SHIFT LEVER POSITION
6. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
7. INSTALL ENGINE UNDER COVER LH