Use body straightening system to perform this operation. Separation is made in front of the bulkhead.
Remove, Disconnect Remove attaching parts. Drill off side member from control arm brace and spring strut tower. Separate side member in front of bulkhead.
Install, Connect Prepare welding flanges. Fit side member. Apply spot weld paint. Weld in side member.
Seal side member cavities. |
Apply underseal. |
Install attaching parts. |
|