Operational procedure
|
Paint stage
|
Products
|
Notes
|
|
I
|
II
|
III
|
|
|
Clean
|
x
|
x
|
x
|
Antistatic / silicone remover
|
Spray on using pump atomiser and dry well using highly absorbent
cloth.
|
Sand
|
x
|
x
|
x
|
Wet
|
Sand down fault site with grain no lower than P 800. Give a matt
finish to remaining surface using sanding/matting pad fine, blend
prep.
|
Clean
|
x
|
x
|
x
|
Aqueous degreaser
|
Spray on using pump atomiser and dry well using highly absorbent
cloth.
|
Prime
|
x
|
–
|
x
|
Plastic primer
|
Spray two layers. Setting time 5 minutes. Paint stage II
includes minor repairs (no putty application).
|
Sand
|
–
|
x
|
x
|
Sanding/matting pad fine
|
After drying, only if required.
|
Clean
|
x
|
x
|
x
|
Tack cloth
|
Remove dust (paint mist).
|
|
|
|
|
|
|
Spray base paint
|
x
|
x
|
x
|
Water base coat
|
Apply two feathering single coats wet on wet.
Allow to flash dry until surface has dried matt.
Feather once at reduced pressure, if required.
Setting time prior to the clear coat application
15 minutes.
|
Spray clear coat
|
x
|
x
|
x
|
As required.
2-C HS clear coat
VOC clear coat
Water base clear coat
|
Pre-spray one layer. Setting time 3 to 5 minutes. Final spraying
with one more layer. Setting time 8 minutes prior to oven
drying.
|