Install, Connect
Insert valve (5), connect to both coolant hoses (3) and (4) and to vacuum hose (6). Note installation position (arrow on valve housing). Connect hose (1) and attach cable ties (2).
Top up and bleed cooling system - see corresponding operation. Ensure that anti-freeze is adequate down to -30 ° C / -22 ° F.