Alternator, Remove and Install (V-Belt Drive) Vehicles up to MY '95
Remove, Disconnect Disconnect ground lead from battery. Remove wiring harness plug from temperature sensor (3) (only C 14 SE). Remove air cleaner housing (1) with air intake hose (2). Remove throttle valve system on C 14 SE engine - see operation "Throttle Body, Remove and Install". |
|
Unclip octane number plug from bracket (2). Unclip engine wiring harness from wiring trough (1) and bracket (3) and lay aside. |
|
Remove, Disconnect Unscrew connecting cables B+ and D+/61 from alternator. Unscrew alternator from tension plate and from alternator bracket (arrows). Remove V-belt from alternator. Loosen shackle at intake manifold and turn upwards. Remove alternator upwards from engine compartment. |
|
Install, Connect Insert alternator in alternator bracket and tighten bolts. Install V-belt to alternator pulley. Bolt alternator to ground cable and shackle (see illus.). |
|
Install, Connect Tension V-belt - see operation "V-belt Tension, Check and Adjust".
Tighten (Torque)
Alternator to alternator bracket (M10) |
- 40 Nm / 29.5 lbf. ft. |
Alternator to alternator bracket (M8) |
30 Nm / 22 lbf. ft. |
Alternator shackle to alternator |
- 25 Nm / 18 lbf. ft. |
Alternator shackle to intake manifold |
- 25 Nm / 18 lbf. ft. |
Install, Connect |
|
Install throttle body on C 14 SE engine - see operation "Throttle Body, Remove and Install". Install air cleaner housing (1) and air intake hose (2). Connect temperature sensor (3) wiring harness plug, if present. Connect battery ground cable. |
|
|