vauxhall Workshop Repair Guides

Vauxhall Workshop Service and Repair Manuals

Mechanical Fuel Injection System (Diesel Engine)|Specifications > < Solenoid Cutoff Valve, Remove and Install

 

Solenoid Cutoff Valve, Remove and Install (X 15 DT, X 17 D)  

Object Number: 616191  Size: DEFAULT  Remove, Disconnect   

Remove intake manifold, fuel pressure and return lines and oil cooler. Remove solenoid cutoff valve control valve - see operation "Solenoid Cutoff Valve Control Unit, Remove and Install (X 15 DT, X 17 D)".  

Pull back rubber grommet and unscrew electrical connecting cable from solenoid cutoff valve (arrow).  

Object Number: 2378750  Size: DEFAULT

Unscrew solenoid cutoff valve.  

Object Number: 616192  Size: DEFAULT  Install, Connect   

Screw in solenoid cutoff valve with new seal ring. Bolt electrical connecting cable to solenoid cutoff valve. Insert rubber grommet.  

Object Number: 2378751  Size: DEFAULT

 

 

Object Number: 616192  Size: DEFAULT  Install, Connect   

Install solenoid cutoff valve control unit with new shear bolts - see operation "Solenoid Cutoff Valve Control Unit, Remove and Install (X 15 DT, X 17 D)".  

Install oil cooler, fuel lines and intake manifold - see operation "Solenoid Cutoff Valve Control Unit, Remove and Install (X 15 DT, X 17 D)".  

Notice: 

The solenoid cutoff valve control does not require reprogramming after replacement of the solenoid cutoff valve.  

 

 


Related Literature Units
-

Mechanical Fuel Injection System (Diesel Engine)|Specifications > < Solenoid Cutoff Valve, Remove and Install