Attach air intake pipe and connection hose to throttle body. Bolt on wiring trough and ground cable. Attach Bowden cable (2, see illus. I) to throttle body. Attach upper part of intake manifold to lower part of intake manifold and to cylinder head cover with new gasket - 8 Nm / 6 lbf. ft. Fasten hose clamps of rubber scoop between upper part of intake manifold and throttle body. Fasten all disconnected hoses and connection cables to upper part of intake manifold again. Push tank vent valve from above into bracket (see illus. II) until lug engages. Attach all disconnected coolant hoses to coolant compensation tank. Install coolant compensation tank. Connect ground cable to battery. Top up and bleed cooling system - see corresponding operation. Ensure that anti-freeze is adequate down to -30 ° C / -22 ° F. |