Load Pressure Sensor, EDC HDRC
Objective:
Checking Operation of the load pressure sensor.
Measurement:
Plot of voltage at the signal output of the load pressure
sensor.
Preparation:
Switch off the engine and ignition. Engine oil temperature
greater than 80°C .
Connections:
INPUT A
|
COM/TRIGGER
|
INPUT B
|
Connect the red measurement lead to pin B (2), of the plug
connector to the load pressure sensor. Connect the black ground
lead to ground.
|
|
|
Procedure Tech 31:
1. |
Download Reference curve. |
2. |
Start the engine and allow it to idle. |
3. |
Depress the accelerator pedal quickly down to the
limit stop and immediately release it again. The measurement should
not take longer than half a second. |
Reference Curve:
|
|
Procedure Tech 32:
1. |
Download Setup file (the Tech 32 uses only Setup
files, no reference curves). |
2. |
Start the engine and allow it to idle. |
3. |
Depress the accelerator pedal quickly down to the
limit stop and immediately release it again. The measurement should
not take longer than half a second. |
Setup File:
Reference Curve:
|
|
|