J792900 Timing, Check (Z 18 XE, with Air
Conditioning, LHD)
Remove
2. |
Remove engine cover.
• |
Unscrew oil filler pipe cap
|
• |
Screw on oil filler pipe cap
|
|
3. |
Remove air cleaner housing (1)
• |
Disconnect 2 wiring harness plugs
– |
Hot film mass air flow meter (4), tank vent valve (2)
|
|
• |
Detach engine vent hose (3)
|
|
|
|
4. |
Remove upper part of toothed belt cover
• |
Unscrew 3 bolts (arrows)
|
• |
Unclip from rear toothed belt cover
|
|
|
|
6. |
Remove right-hand air duct
• |
Unscrew 3 bolts (arrows)
|
|
7. |
Remove ribbed V-belt cover
|
|
|
9. |
Timing, Check
• |
Set crankshaft to mark.
– |
Marks on crankshaft ribbed V-belt pulley and front toothed belt
cover (2) must align
|
|
• |
Fix camshaft sprockets in position.
– |
Marks (1) must be opposite one another and aligned with the top
edge of the cylinder head.
|
|
• |
If KM-852 cannot be inserted, a basic
adjustment of the timing must be performed
|
|
|
|
Install
11. |
Install upper part of toothed belt cover
• |
Clip to rear of toothed belt cover
|
|
12. |
Install air cleaner housing
• |
Attach engine vent hose
|
• |
Clip in tank vent valve
|
• |
Connect 2 wiring harness plugs
|
|
13. |
Install engine cover.
• |
Unscrew oil filler pipe cap
|
• |
Screw on oil filler pipe cap
|
|
15. |
Install ribbed V-belt cover
|
|