Attaching Parts – Cylinder Head, Remove and
Install
Remove
1. |
Detach exhaust manifold heat shield (2)
• |
Detach engine transport shackle (3)
|
• |
Unscrew 2x nuts (5) from exhaust manifold (1)
|
|
2. |
Remove 4x sheathed glow plug (1)
|
3. |
Remove oil pressure switch (2)
|
4. |
Detach exhaust manifold (3)
|
|
|
5. |
Detach thermostat housing (2)
|
|
|
6. |
Detach throttle valve module bracket (1)
|
|
|
7. |
Detach metal pipe for exhaust gas recirculation (3)
• |
Unscrew 2x bolts (1) from flange of exhaust gas recirculation
valve
|
• |
Unscrew 3x bolts (5) from intake manifold
|
|
|
|
8. |
Detach exhaust gas recirculation cooler (2)
|
|
|
9. |
Detach intake manifold (1)
• |
Unscrew 9x bolt (2) and (3)
Note: Note different
bolt lengths!
|
|
|
|
10. |
Clean sealing surfaces.
|
11. |
Transfer 6x stud bolt
|
Install
12. |
Install inlet manifold
• |
Tighten 9x bolts 25 Nm
Note: Note different
bolt lengths!
|
|
13. |
Attach exhaust manifold
• |
Replace gasket
– |
Tighten 10x new nut 15 Nm +
30°
Note: Coat thread with
lubrication compound. Select suitable lubrication compound from the
spare parts catalogue.
|
|
|
14. |
Attach exhaust gas recirculation cooler
|
15. |
Attach metal pipe, exhaust gas recirculation
• |
Check seal ring for damage
|
• |
Tighten 2x bolts on flange of exhaust gas recirculation valve
9 Nm
|
• |
Tighten 3x bolts on intake manifold 9
Nm
|
|
16. |
Attach throttle valve module bracket
|
17. |
Attach thermostat housing
|
18. |
Attach exhaust manifold
• |
Tighten 10x new nut 15 Nm +
30°
|
|
19. |
Attach oil pressure switch
• |
Tighten oil pressure switch 32
Nm
|
|
20. |
Install 4x sheathed glow plug
• |
Tighten 4x sheathed glow plug 10
Nm
|
|
|