Heat up cemented area with a lamp or stand heater.
See table for hardening times
Hardening
Temperature °C/°F Ready
for installation Final
20/68 80 minutes 10
hours
60/140*) 10 minutes 6 hours
80/176*) 5 minutes 15 minutes
*) with heating source, do not exceed
80 °C/176 °F.
The rear quarter window is ready to install after cooling to
room temperature.
If the cement is not hardened with additional heat, the
window can be installed after 24 hours.
|