Open relay frame cover.
Disconnect temperature probe (3) wiring harness connector.
Remove control unit holder (4) from relay holder.
Unlock wiring harness connector (5) from control unit holder and
detach.
Remove Control unit holder (1) fastening nuts (2). Remove
control unit from control unit holder.
Install
Place control unit in control unit holder. Install control unit
fastening nut.
Connect and lock wiring harness connector to control unit.
Place control unit in relay holder. Connect wiring harness
connector to temperature probe.
Close relay frame cover.
|