Install
Insert valve spring (2) and valve piston (1).
Install fuel cutoff solenoid valve and new seal (3) in injection
pump – tightening torque 20 Nm / 15 lbf. ft.
Attach wiring harness connector to fuel cutoff solenoid
valve.
Attach fuel return line and new seals to injection pump –
tightening torque 23 Nm / 17 lbf. ft.
Install intake manifold – see operation "Intake Manifold,
Remove and Install".
|