vauxhall Workshop Repair Guides

Vauxhall Workshop Service and Repair Manuals

Other Information > < Production paint specifications on the vehicle identification plate

 

Time allowance specifications (TA)  

The division of the preparatory operations is defined as follows:  

 

•  Coarse putty operations and sealing operations come under sheet-metal operations in group A.  

•  Fine putty operations come under the paint operations in group B.  

•  Paintable surfaces are to be produced in the sheet-metal operations division (body workers, panel beaters).  

•  The paint operations division (painters) takes over the work from the sheet-metal operations division and completes the surface to be painted.  
In addition: a maximum of 3 thin filler coats for bolted components and/or a maximum of 4 thin filler coats for welded components.  

 

Notice: 

Spraying colour samples for the painting of individual parts is a part of the set-up time.  

 

 


Related Literature Units
-

Other Information > < Production paint specifications on the vehicle identification plate