Explanation of Time Allowances - Paint Stages I, II, II a, II b and III The previously familiar painting stages I, II and III apply for painting individual parts.
• For blending (blending system), painting stage II a applies.
• For touching-up (blending system) painting stage II b applies.
Painting stages II a and II b correspond to painting stage II. Only use drift-in painting / blend-in painting with two-coat paint systems. Paint systems
• 2-coat solid paint systems
• 2-coat metallic paint systems
• 2-coat mica-effect paint systems
As a result of the incorporation of the blending system, the paint systems are extended to include "drift-in painting" and "blend-in painting". These systems are used to achieve optimum colour-matching with solvent-based paint and preparation materials for 2-coat paint systems.
The time allowances for paint operations in the main and combination operations are organised into the following stages:
Painting stage / painting individual parts |
Sheet metal parts |
I |
Painting new components |
|
o |
Partial application of putty for welded-in parts - attached sheet-metal parts |
|
o |
Fill complete surface |
|
o |
Top-coat complete surface |
II |
Painting surfaces |
|
o |
Top-coat complete surface, including small improvements (without filler application) |
III |
Repair painting |
|
o |
Partially apply putty to up to 50% of surface to be painted in operation area. |
|
o |
Fill working surface |
|
o |
Top-coat complete surface |
Paint stage / blending |
Sheet metal parts (2-coat paint system only) |
II a |
Drift-in Painting |
|
o |
Drift-in basefix to approx. 50 % into the adjoining part |
II b |
Blend-in Painting |
|
o |
Drift-in basefix into the whole, adjoining part |
Painting stage / painting individual parts |
Plastic parts |
I |
Painting new components |
|
o |
Top-coat complete surface |
II |
Painting surfaces |
|
o |
Fill complete surface |
|
o |
Top-coat complete surface |
III |
Repair painting |
|
o |
Partially cement worked area and apply putty (Cement 90 544 117 / 15 05 004 - plastic repair kit) to approx. 10% of the part surface area |
|
o |
Fill complete surface |
|
o |
Top-coat complete surface |
|
o |
Create structure if required (structure spray 09 121 521 / 17 58 503) |
Consult the current "Plastic Repair" brochure for additional information.
|