Introduce coupling and balls into bracket. Notice: Note position of the coupling (4): Carrier (3) can only be installed in one position, recess (1) of coupling must point towards upper edge of bracket (2). Lock cylinder in channel sleeve, detach key, install lock cylinder and housing. Drive in new roll pin, caulk roll pin on rear side of bracket with centre punch (5). Install pressure and torsion springs, carrier and safety washer. Notice: Ensure springs are correctly seated.
Install, Connect Handle recess with linkage, sash window guide rail, water vapour barrier. Front door inner panelling - see operation "Inner Panelling - Front Door, Remove and Install". |