vauxhall Workshop Repair Guides

Vauxhall Workshop Service and Repair Manuals

Hot Film Mass Air Flow Meter, Remove and Install > < Supplement to Service Instructions and Labour Time Guides; Vectra-B X20DTL/X20DTH

 

Air Cleaner Housing, Air Ducts  

Notice: 

Before assembling components of the intake system (hoses, connections, etc.), they must be cleaned of any possible contamination (grease, oil, etc.). When tightening the hose clamps, be sure to observe exactly the tightening torque of 3.5 Nm / 2.6 lbf. ft.  

Object Number: 616201  Size: DEFAULT  Important!   

It is only ensured that the intake system is free of leaks, thus ensuring operational safety of the engine, if the hose clamps are tightened correctly to the prescribed tightening torque.  

 

 

Illustration (X 20 DTL)  

 

1  Air intake manifold  

2  Air cleaner housing, lower part  

3  Air cleaner housing, upper part  

4  Air intake hose  

5  Hot film mass air flow meter  

6  Air intake hose  

7  Charge air pipe  

8  Charge air hose  

 

Object Number: 2395990  Size: DEFAULT

 

 

Hot Film Mass Air Flow Meter, Remove and Install > < Supplement to Service Instructions and Labour Time Guides; Vectra-B X20DTL/X20DTH