Eos (1F7) L4-2.0L Turbo (BPY) (2007)
Exhaust Bypass Valve: Testing and Inspection
Wastegate Bypass Regulator Valve N75, Checking
Special tools, testers and auxiliary items required
‹› Multimeter.
‹› Wiring diagram.
Test requirements
‹› The Motronic Engine Control Module (ECM) ( J623 ) fuses OK.
‹› The Wastegate Bypass Regulator Valve (N75) OK.
‹› Battery voltage at least 12.5 volts.
‹› All electrical consumers such as, lights and rear window defroster, switched off.
‹› On vehicles with automatic transmission, selector lever in position " P" or "N".
‹› A/C switched off.
‹› Ground (GND) connections between engine/transmission/chassis OK.
‹› Ignition switched off.
‹› Voltage for the Wastegate Bypass Regulator Valve ( N75) is supplied by the Engine Component Power Supply Relay (J757).
Test procedure
-
Perform a preliminary check to verify the customers complaint. Refer to => [ Preliminary Check ] See: Computers and Control Systems/Testing
and Inspection/Scan Tool Testing and Procedures/Preliminary Check
Start diagnosis
-
Remove the engine cover with air filter.
Checking internal resistance
-
Disconnect the Wastegate Bypass Regulator Valve ( N75) electrical harness connector- 1 -.
-
Using a multimeter, check the Wastegate Bypass Regulator Valve (N75) terminals 1 to 2 for resistance.