Eos (1F7) L4-2.0L Turbo (BPY) (2007)
-
Install new bolts - arrows - and tighten diagonally in multiple stages to 10 Nm.
-
Set new oil pump cover - A - in place and tighten bolts - arrows - in diagonal sequence and in multiple stages to 8 Nm.
-
Install cable bracket on large cover and tighten nuts to 10 Nm.
-
Connect connector of Direct Shift Gearbox (DSG) Mechatronic J743 and engage retainer by turning.
-
If present: Install connecting hose between charge air cooler and charge air tube.
-
Reinstall any vehicle parts removed.
-
Connect battery Ground (GND) strap.
-
Do not start engine!
-
Change DSG oil and filter.
-
Install noise insulation.
-
Perform basic measurement on Direct Shift Gearbox (DSG) Mechatronic J743.