Eos (1F7) V6-3.2L (BUB) (2008)
-
Tensioning band 1 and tensioning bands 2 and 3 are secured.
-
Raise rear window frame and remove Hinge Supports VAS 6365.
-
Close hydraulic pump bypass screw and close roof.
-
Carefully press tensioned headliner - 1 - and roof pillar trim - 7 - apart and secure double eye - 4 - on main hinge arm. Direction of double eye is
parallel to edge of outrigger.
-
Secure tensioning band - 5 - on end eye - 6 - on outside of main hinge in upper threaded connection.
-
Pull tensioning band - 2 - between main hinge and water drain hose.
-
Secure the end eyes - 3 - in the lower threaded connection on the outside of the main hinge.
Headliner Tensioning Bands, Assembly Overview
Headliner Tensioning Bands, Assembly Overview
NOTE:
-
Before routing tensioning bands, tensioned headliner must be installed.
-
The sequence for securing tensioning bands must be followed exactly.