Eos (1F7) V6-3.2L (BUB) (2008)
Installing
Installation is carried out in the reverse order. When doing this note the following:
‹› When installing flexible shaft, adapter and air distribution rotary switch on controls for hot air and fresh air must have a specific position to each
other, otherwise it will malfunction.
‹› After installing, function of air distribution door must be checked.
Checking:
Flexible shaft for adjusting unit of air distribution doors:
-
Let fresh air blower run on highest speed. If air flows out of defroster vents in the "Defrost" position and no air flows out of footwell vents,
installation of flexible shaft is correct. If this is not the case, remove flexible shaft from adapter. Place controls for heating and A/C system,
Climatic onto adapter and rotate rotary knob for air distribution 1 /2 rotation (180°). Then re-connect flexible shaft. Repeat test
Temperature Regulator Door Motor
Climatic A/C System with Manual Control
Temperature Regulator Door Motor
Removing
-
Remove left footwell vent. Refer to => [ Left Footwell Vent ] See: Air Register/Service and Repair
-
Remove the left footwell trim.
-
Remove Data Bus On Board Diagnostic Interface ( J533).
-
Remove the bolts - 3 - (9 ± 1.3 Nm).
The bolts - 1 - are not to be removed.