volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

Leak Detection Pump, Evaporative System|Testing and Inspection|Page 3150 > < Leak Detection Pump, Evaporative System|Testing and Inspection|Page 3148
Page 3
background image

If the manufacturers test box is being used. Perform the following step.

-

Install the Test Box 105 Pin (VAG1598/31).

If the manufacturers test box is not being used. Perform the following step.

-

Remove the Engine Control Module (ECM) (J623). Refer to => [ Engine Control Module J623, Replacing ] See: Computers and Control
Systems/Engine Control Module/Service and Repair/Engine Control Module J623, Replacing.

-

Using a Multimeter, check the Leak Detection Pump (LDP) (V144)electrical harness connector terminal 3 to the Engine Control Module (ECM)
Power Supply Relay (J271) terminal 2/87 for an open circuit according to wiring diagram.

Specified value: Wire resistance 1.5 ohms.

If the specification was not obtained:

-

Check the wiring for a short circuit to Battery positive (+) or an open circuit.

-

Check the electrical harness connector for damage, corrosion, lose or broken terminals.

-

If necessary, repair the faulty wiring connection.

If no malfunction is detected in the wiring and if the voltage supply is OK:

Checking output wiring

-

Using a Multimeter, check the Leak Detection Pump (LDP) (V144) electrical connector terminals to Engine Control Module (ECM) (J623)
electrical connector T121 for an open circuit.

Leak Detection Pump, Evaporative System|Testing and Inspection|Page 3150 > < Leak Detection Pump, Evaporative System|Testing and Inspection|Page 3148