Eos (1F7) V6-3.2L (BUB) (2008)
Checking voltage supply and wiring
-
Switch the ignition on.
-
Using a Multimeter, check the following wiring connections for voltage.
-
Switch the ignition off.
If the specification is not obtained:
If the manufacturers test box is being used. Perform the following step.
-
Install the Test Box 105 Pin (VAG1598/31).
If the manufacturers test box is not being used. Perform the following step.
-
Remove the Engine Control Module (ECM) (J623). Refer to => [ Engine Control Module J623, Replacing ] See: Computers and Control
Systems/Engine Control Module/Service and Repair/Engine Control Module J623, Replacing.
-
Using a Multimeter, check the Throttle Position (TP) Sensor (G79)/Accelerator Pedal Position Sensor 2 (G185) electrical harness connector
terminals to the Engine Control Module (ECM) (J623) electrical connector T121 for an open circuit according to wiring diagram.