Eos (1F7) V6-3.2L (BUB) (2008)
-
Set new oil pump cover - A - in place and tighten bolts - arrows - in diagonal sequence and in multiple stages to 8 Nm.
-
Install cable bracket on large cover and tighten nuts to 10 Nm.
-
Connect the connector of the Direct Shift Gearbox (DSG) mechatronic J743 and engage retainer by turning.
-
If present: Install connecting hose between charge air cooler and charge air tube.
-
Reinstall any vehicle parts removed.
-
Connect battery Ground (GND) strap.
-
Do not start engine!
-
Replace the DSG oil and filter.
-
Install noise insulation. Refer to:
-
Perform basic measurement on Direct Shift Gearbox (DSG) mechatronic J743.