Eurovan MV V6-2.8L (AXK) (2002)
-
Check wire between 4-pin connector terminal 3 and relay carrier for open circuits according to wiring diagram. Wire resistance: max: 1.5 Ohms
-
Check each wire, from 4-pin connector terminal 1 to Ground (GND) and from terminal 2 to Ground (GND) for open circuit. Wire resistance: max:
1.5 Ohms
If there is no malfunction in voltage supply:
Checking activation
-
Using adapter cables from the VAG1594 connector test kit, connect VAG1527B voltage tester to
Terminals 4 + engine Ground (GND) of disconnected connector for cylinder 1.
-
Operate starter and test ignition signal from Engine Control Module (ECM). LED should flicker.
-
Repeat test at connectors for fuel injectors 2 through 6.
-
Switch ignition off.
If LED flickers and voltage supply is OK:
-
Replace relevant ignition coil with power output stage
-
Check DTC memory, repair any malfunctions and then erase DTC memory.
-
Read readiness code. If DTC memory was erased or the Engine Control Module (ECM) was disconnected from the continuous B+ supply, the
readiness code must be re-generated. Refer to Monitors, Trip and/or Drive Cycle (Readiness Codes)/Reading Readiness Code. See: Computers
and Control Systems/Testing and Inspection Refer to Monitors, Trip and/or Drive Cycle (Readiness Codes)/Generating Readiness Code. See:
Computers and Control Systems/Testing and Inspection
If LED does not flicker:
Checking wiring