GLI L4-2.0L Turbo (CCTA) (2008)
Rear Knuckle: Service and Repair
Wheel Bearing Housing, Bearing and Trailing Arm Assembly Overview
Wheel Bearing Housing, Bearing and Trailing Arm Assembly Overview
1
Bolt, 50 Nm + 45° additional turn
‹› Always replace after removal.
2
Mounting bracket
3
Bolt, 90 Nm + 90° additional turn
‹› M12 x 1.5 x 80.
‹› Always replace after removal.
4
Coupling rod
‹› Connects the stabilizer bar to the trailing arm/wheel bearing housing.
5
Bolt, 90 Nm + 90° additional turn
‹› Follow the tightening sequence, refer to --> [ Installing ] See: Trailing Arm/Service and Repair/Trailing Arm with Mounting Bracket.
‹› Always replace after removal
6
Trailing arm