–
| Attach lifting tackle -2024 A- as follows and lift slightly with workshop crane: |
Belt pulley end: 4th hole in hook rail at position 1 |
Flywheel end: 2nd hole of hook rail in position 6 |
WARNING The hooks and locating pins must be secured with locking pins. |
|
Note t
| The positions marked 1…4 on the bar must be towards the pulley end. |
t
| The holes in the hook rails are counted up from the hook. |
Continuation for all vehicles |
–
| Remove engine carrier and lift assembly out forwards. |
Note When lifted out, the assembly must be carefully guided to prevent damage to the bodywork. |
Before carrying out repair work, secure engine on assembly stand with engine and gearbox support -VW 540-. |
|
|
|