Checking charge pressure control solenoid valve N75
Checking charge pressure control solenoid valveN75
Checking charge pressure control solenoid valve -N75-
–
Switch off ignition.
–
Pull connector off charge pressure control solenoid valve.
–
Measure resistance between valve contacts.
Engine code AGR
Specification: 25…45 Ω
Engine code AHF, ALH, ASV
Specification: 14…20 Ω
If the specification is not attained:
–
Renew charge pressure control solenoid valve -N75-.
If the specification is obtained:
–
Switch on ignition.
–
Measure supply voltage between valve connector -contact 1- and engine earth. Specification: approx. battery voltage
If the specification is not attained:
–
Switch off ignition.
Vehicles with 80-pin control unit
–
Connect test box -V.A.G 1598/22- to control unit wiring harness.
–
Check wiring between text box and connector for open circuit using current flow diagram. -Contact 1+socket 2 and 28- and -contact 2+socket 15- wire resistance: max. 1.5 Ω
–
Also check wiring for short to one another, short to earth and short to battery positive. Specification: ∞ Ω
Vehicles with 121-pin control unit
–
Connect test box -V.A.G 1598/31- to control unit wiring harness.
–
Check wiring between text box and connector for open circuit using current flow diagram. -Contact 1+socket 1 and 2- and -contact 2+socket 62- wire resistance: max. 1.5 Ω
–
Also check wiring for short to one another, short to earth and short to battery positive. Specification: ∞ Ω
Continuation for all vehicles
If no fault in lines is detected:
–
Renew diesel direct injection system control unit -J248- → Rep. Gr.23