Golf Mk6
Assembly overview - turbocharger |
|
1 - | Charge pressure control solenoid valve -N75- |
2 - | 10 Nm |
3 - | 7 Nm |
4 - | Turbocharger air recirculation valve -N249- |
q | To remove, pressure pipe must be removed → Anchor. |
5 - | O-ring |
q | Renew if damaged. |
6 - | Turbocharger |
q | Removing and installing → Chapter. |
q | Checking turbocharger vacuum unit → Chapter. |
q | Removing and installing vacuum unit for turbocharger → Chapter. |
q | Adjusting vacuum unit for turbocharger → Chapter. |
7 - | Connecting hose |
8 - | Connecting hose |
|
1 - | 8 Nm |
2 - | Coolant pipe |
3 - | O-ring |
q | Renew. |
4 - | Turbocharger |
q | Specified torque for catalytic converter studs: 20 Nm |
q | Removing and installing → Chapter. |
q | Checking turbocharger vacuum unit → Chapter. |
q | Removing and installing vacuum unit for turbocharger → Chapter. |
q | Adjusting vacuum unit for turbocharger → Chapter. |
5 - | Seal |
q | Renew. |
6 - | Bracket |
Note
t | Retainer is discontinued. |
t | The retainer is not reinstalled in cases of repair. |
7 - | Bracket |
Note
t | Retainer is discontinued. |
t | The retainer is not reinstalled in cases of repair. |
8 - | 25 Nm |
q | Renew studs and fastening nuts. |
Screw studs into cylinder head until they project only by 25 mm. |
Observe tightening sequence: items -A- to -I-. |
9 - | Coolant pipe |
10 - | Seal |
q | Renew. |
11 - | 8 Nm |
12 - | Oil return pipe |
13 - | Seal |
q | Renew. |
14 - | Banjo bolt, 20 Nm |
q | Secured to valve timing housing. |
15 - | Oil supply pipe |
Caution
|
16 - | Banjo bolt, 30 Nm |