volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

Air Bypass Valve Solenoid, Turbocharger|Testing and Inspection|Page 6599 > < Air Bypass Valve Solenoid, Turbocharger|Testing and Inspection
Page 2
background image

Specified value: 20 to 30 Ohms (at approx. 20 degrees C) 

If the specification was not obtained:

-

Replace the Turbocharger Recirculating Valve N249.

If the specification was obtained:

Checking Voltage supply 

-

Using a multimeter, check the Turbocharger Recirculating Valve N249 electrical harness connector terminal 1 to Ground (GND).

Turbocharger Recirculating

Measure to  

Valve N249electrical harness
connector terminal
 
1

Engine Ground (GND)

-

Operate the starter briefly.

Specified value: battery voltage. 

-

Switch the ignition off.

If the specified value was not obtained:

-

Check the wiring for a short circuit to each other, Battery (+), and Ground (GND).

-

Check the electrical harness connector for damage, corrosion, lose or broken terminals.

-

If necessary, repair the wiring connection.

If no malfunctions are found in the wiring:

Checking wiring 
If the manufacturers test box is being used. Perform the following step.

-

Install the test box..

If the manufacturers test box is not being used. Perform the following step.

-

Remove the Motronic Engine Control Module (ECM) J623.

-

Using a multimeter, check the Turbocharger Recirculating Valve N249 electrical harness connector terminal 2 to Motronic Engine Control
Module (ECM) J623 electrical harness connector T60 terminal 21 for an open circuit.

Air Bypass Valve Solenoid, Turbocharger|Testing and Inspection|Page 6599 > < Air Bypass Valve Solenoid, Turbocharger|Testing and Inspection