volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

Canister Purge Control Valve|Testing and Inspection|Page 3252 > < Canister Purge Control Valve|Testing and Inspection
Page 2
background image

-

Fuse No. 43 must be OK.

Functional check

-

Connect VAG 1551 scan tool ((V.A.G 1552). Start engine and select the engine control module with the "Address word" 01. Connecting scan tool
and selecting engine control module:

Indicated on display:

Rapid data transfer

HELP

Select function XX

-

Press keys 0 and 8 for the "Read measured value block" function and confirm entry with Q key.

Indicated on display:

Read measured value block
Input display group number XXX

-

Press keys 0, 7 and 0 for "Display group number 70" and confirm entry with Q key.

Indicated on display: (1 to 4 = Display zones)

Read measured value block 70

->

1

2

3

4

-

Press key 4 for the "Basic setting" function ("Tank venting valve diagnosis" will be initiated)

NOTE:  The engine must not be loaded during this diagnosis because the diagnosis will be interrupted and will not be started again until the engine is
revved-up.

Indicated on display: (1 to 4 = Display zones)

System In basic setting 70

->

1

2

3

4

When the diagnosis is initiated by the engine control module, the display in display zone 4 jumps from "Test OFF" to "Test ON"

-

Run engine at idling speed until the specification "TBV OK" is displayed in display zone 4.

NOTE:  TBV stands for tank breather valve (Evaporative Emission (EVAP) canister purge regulator valve).

If "TBV not OK" appears in display zone 4:

-

Initiate the Output Diagnostic Test Mode and activate the Evaporative Emission (EVAP) canister purge regulator valve (N80):

-

Check DTC memory:

-

Read out readiness code:

-

If the DTC memory has been erased or the engine control module separated from the permanent positive, the readiness code must be generated
again.

If the specification "TBV OK" is obtained:

Canister Purge Control Valve|Testing and Inspection|Page 3252 > < Canister Purge Control Valve|Testing and Inspection