Jetta L4-1.8L Turbo (AWP) (2004)
Do not use a bonded rubber mounting which has been stored unsealed!
-
Assemble special tool with bonded rubber mounting.
1 - Spindle T10030/3
2 - Washer with chamfer
3 - Thrust tube 10030/4
-
Shoulder arrow faces toward bonded rubber mounting
4 - Bonded rubber bushing
-
Coat bonded rubber mounting with, for example, liquid soap.
-
Install bonded rubber bushing and special tools on subframe.
-
Pull in bonded rubber mounting by turning spindle.
1 - Washer
2 - Installation position of bonded rubber mounting in subframe
Spindle must be inserted from below to remove and pull in subframe front bonded rubber mounting.
Further installation of subframe is performed in reverse order
Bonded Rubber Mountings For Final Drive, Removing and Installing
Bonded rubber mountings for final drive, removing and installing