Jetta L4-2.0L (BEV) (2004)
Shift Solenoid: Testing and Inspection
Solenoid Valves In Valve Body, Checking
Recommended special tools and equipment
-
V.A.G 1526 multimeter or V.A.G 1715 multimeter
-
V.A.G 1594 connector test kit
-
Wiring diagram
Requirements
-
Respective fuses must be OK.
-
Selector lever must be in -P- position.
-
All electrical consumers such as, lights and rear window defroster must be switched off.
-
Parking brake must be engaged.
-
Ground (GND) connections to transmission must be OK.
-
Ignition switched off.
Work sequence
-
Disconnect 12-pin harness connector at transmission.
Observe safety precautions.
-
Check harness connector for contact corrosion and ingress of water.
If harness connector is not OK.
-
Repair malfunction.
-
Erase DTC memory of Transmission Control Module (TCM), Diagnostic mode 4: Reset/erase diagnostic data. See: Powertrain
Management/Computers and Control Systems/Testing and Inspection/Scan Tool Testing and Procedures/With Generic Scan Tool/Diagnostic
Mode 4: Reset/Erase Diagnostic Data
-
Generate readiness code. See: Powertrain Management/Computers and Control Systems/Testing and Inspection/Monitors, Trips, Drive Cycles and
Readiness Codes.
If harness connector is OK.
-
Check resistance of solenoid valves.
Checking resistance of solenoid valves
-
Re-connect 12-pin connector.
-
Connect test box to control module wiring harness, connect test box for wiring test. See: Powertrain Management/Computers and Control
Systems/Testing and Inspection/Reading and Clearing Diagnostic Trouble Codes/Scan Tool Connecting/Test Box, Connecting For Wiring Test
-
Measure resistance of solenoid valves at test box between sockets:
NOTE: Resistance value is valid at approx. 20 degrees C. At higher temperatures, resistance value increases.
If one of the specified values is not obtained.
-
Check wires to Transmission Control Module (TCM) according to wiring diagram.
Checking wires to Transmission Control Module (TCM)
-
Checking wires to Transmission Control Module (TCM)