Jetta GLS V6-2.8L (AFP) (2002)
-
Set and check position of crankshaft in relation to intermediate shaft.
The ground tooth of drive gear -B- must be aligned with the bearing parting line (TDC cyl. 1).
-
Install bolt without collar for sliding rail -2- and tighten to 10 Nm.
-
Install sliding rail -2- with roller chain -1- and both sprockets -3- and -4- (note direction of travel of roller chain).