volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

Timing Chain|Removal and Installation|Page 2276 > < Timing Chain|Removal and Installation|Page 2274
Page 4
background image

-

Install bearing bolt with collar for sliding rail and tighten to 10 Nm. 

Note:  If the cylinder head is removed:

-

Install cylinder head

-

Push sliding rail onto bearing bolt. Insert short mounting screw with "D6" locking compound and tighten both bolts to 20 Nm. 

-

Place camshaft roller chain on intermediate shaft (note direction of travel).

-

Mount camshaft sprocket and roller chain on camshaft for cylinder bank 1, 3 and 5 (long camshaft) and counter tighten by hand.

-

Mount camshaft sprocket (with pickup wheel for Hall generator) and camshaft roller chain to camshaft for cylinder bank 2, 4, and 6 and tighten by
hand.

Note:  Coat contact surfaces of the bolt heads with oil when installing.

-

Remove camshaft guide 3268.

-

Tighten mounting bolts for camshaft sprockets to 100 Nm. 

Note:  Hold camshaft -arrow- only with open-end wrench SW 24. The camshaft guide 3268 must not be inserted when tightening or loosening the
sprockets.

-

Coat sealing surface of sealing flange with AMV 188 001 02 and install. Tighten mounting bolt to 10 Nm. 

-

Replace oil seal for sealing flange.

-

Prepare cylinder head gasket for assembly.

-

Coat sealing surface of cover piece with AMV 188 001 02.

-

Coat O-ring for oil passage seal and insert in cover piece.

-

Install cover piece, insert all mounting bolts and turn in opposite direction slightly.

-

Initially tighten 8 mm mounting bolts to 25 Nm, then tighten 6 mm mounting bolts to 10 Nm.

-

Install chain tensioner for camshaft roller chain and tighten to 40 Nm. 

Timing Chain|Removal and Installation|Page 2276 > < Timing Chain|Removal and Installation|Page 2274