Jetta SportWagen L5-2.5L (CBUA) (2009)
Resetting Service Position
Installation is performed in the reverse order of removal.
-
Align lock carrier at longitudinal members and between fenders.
‹› Make sure that pressure hoses for charge air cooler are re-connect correctly.
‹› Hoses and lines must be pinched.
‹› Re-fill with coolant If necessary.
2.0 Liter
-
Fill cooling system.
2.5 Liter
-
Fill cooling system.
Disconnecting Pressure Hoses
-
Disengage connector coupling - 1 - and disconnect pressure hose - 2 - in - direction of arrow - from coupling.