New Beetle
Assembly overview |
1 - | Right hydraulic cylinder |
q | Removing → Chapter |
2 - | Sliding switch for convertible roof position |
q | Installed only on right side |
q | Unclip from hydraulic cylinder -1- |
3 - | Hydraulic hoses |
q | Removing and installing → Chapter |
4 - | Convertible roof actuation control unit -J256- |
q | On right in luggage compartment |
q | Further information → Current flow diagrams, Electrical fault finding and Fitting locations. |
5 - | Left hydraulic cylinder |
q | Removing → Chapter |
6 - | Plugs |
7 - | Oil filler screw |
q | 5 Nm |
8 - | Hydraulic pump |
q | Removing and installing → Chapter |
9 - | Tommy screw |
q | Turning the toggle screw depressurises the hydraulic system, allowing the convertible roof to be operated manually. |
10 - | Oil-level indicator |
q | With the convertible roof open, the hydraulic fluid must be between the min. and max. marking |
11 - | Contact right, convertible roof protective cover fitted -F156- or left -F155- |
q | Qty. 2. |
12 - | Button for top operation -E137- |
q | Fitted in the centre console. |