New Beetle L5-2.5L (BPR) (2007)
-
Adjust the valve timing. Refer to => [ Valve Timing, Adjusting ] See: Cylinder Head Assembly/Adjustments.
The rest of the installation follows the reverse of the removal procedures. When doing this note the following:
‹› After installing the oil pan, allow the sealant to dry for approximately 30 minutes. Only after then may the engine oil be added.
‹› Remove the (T40069) from the cylinder block and install the locking bolt.
‹› Fill with coolant. Refer to => [ Draining and Filling ] See: Cooling System/Service and Repair/Procedures/Draining and Filling.
Tightening Specifications