New Beetle L5-2.5L (BPR) (2007)
Timing Chain: Service and Repair
Timing Chain Assembly Overview
Timing Chain Assembly Overview
1
Intake Camshaft Adjuster
‹› With the sprocket
‹› Do not disassemble.
2
Exhaust Camshaft Sprocket
‹› Not pressed onto the camshaft.
‹› When removing, press off lightly, if necessary.
3
Cylinder Head
4
Tensioning Rail
‹› For the timing chain tensioner.
‹› Secured to the cylinder block.
‹› Oil before installing the pin.
5
Double Wheel Sprocket
‹› Securing, refer to => [ Oil Pump Drive Chain Assembly Overview ] See: Engine Lubrication/Oil Pump/Service and Repair/Oil Pump Drive